Analisis Stabilitas Decommissioning Barge 400 Feet Ketika Lifting Operation

Authors

  • Alan Dicky Swans Saragih Institut Teknologi Kalimantan
  • Destyariani Liana Putri Institut Teknologi Kalimantan
  • Alamsyah Alamsyah 2Program Studi Teknik Perkapalan Institut Teknologi Kalimantan
  • Anggoronadhi Dianiswara Institut Teknologi Kalimantan

DOI:

https://doi.org/10.62012/zl.v4i3.27699

Keywords:

Barge, Stability, Moses Executive, Decommissioning, Lifting

Abstract

ecommissioning is the final stage of the life of a platform located offshore in order to support the decommissioning activities that will be carried out, a modified barge is designed to become a tool that can assist the dismantling of offshore platforms. The modification made is by adding an appending frame whose function is to lift the platform that is ready to be dismantled. Of course, not only that is a consideration in the modification of the decommissioning barge but also the planning of the stowage plan design for the modified barge model so that the components and cargo on the barge can be placed in the appropriate position so that the designed barge has a capacity that matches the purpose of the barge. Then when you have made a stowage plan for the decommissioning barge, the next step will be modeling the barge starting from making the hull to the load and also the tank. When all these parts have been made, validation is carried out to compare the value of the model with that in the stability booklet, if so, the next step is to create a code using the moses executive. Analysis when lifting that has been simulated in this study getting a value with the highest CoG point variation, the farthest and with a draft variation of 4.5m, 5.5m, 5.8m, it is found that the stability value meets the DNVGL-ST-N001 criteria in the GM (metacenter height) value, intact range, area ratio.

Downloads

Download data is not yet available.

References

“Peraturan Pemerintah Epublik Indonesia Nomor 17 Tahun 1974 Tentang Pengawasan Pelaksanaan Eksplorasi Dan Eksploitasi Minyak Dan Gas Bumi Di Daerah Lepas Pantai.”

“Peraturan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia Nomor 01 Tahun 2011 Tentang Pedoman Teknis Pembongkaran Instalasi Lepas Pantai Minyak Dan Gas Bumi.” [Online]. Available: Www.Djpp.Depkumham.Go.Id

“Dnvgl-St-N001 Marine Operations And Marine Warranty (Edition: 2016-06).” [Online]. Available: Https://Mww.Dnvgl.Com/Document/Get?Projectid=2883&Docname=Dnvgl-St-N00...

N. Samson, E. Ogbonnaya, And K. Ejabefio, “Stability Analysis For The Design Of 5000-Tonnes Offshore Work Barge,” International Journal Of Engineering And Technology, Vol. 3, No. 9, 2013.

N. Samson And A. Sidum, “Numerical And Experimental Analysis For The Stability Of A 2500 Tonnes Offshore Work Boat,” Journal Of Applied Sciences And Engineering Research, Vol. 3, 2014, Doi: 10.6088/Ijaser.030600004.

D. Yimtae, M. Aimcharoenchaiyakul, S. Uiyyasathian, M. Svasti-Xuto, And C. Chanvanichskul, “Spe-193981-Ms Converted Barge For Wellhead Platform Decommissioning,” Ms, 2018.

E. Arianti, A. Ghofur, And B. Teknologi Hidrodinamika Bppt, “Teknologi Decommissioning Anjungan Lepas Pantai Terpancang Pasca-Operasi,” Vol. 9, No. 2, 2019.

A. Santoso, J. Prananda, E. Jadmiko, And I. Alfaris Murtadha, “Flat Top Barge 300feet Design Using Portable Dynamic Positioning System,” 2017.

A. Arifin, W. H. Nugroho, And S. Sahlan, “Kajian Stabilitas Wahana Angkut Alpo Sebagai Fungsi Kapasitas Tangki Ballast,” Jurnal Penelitian Enjiniring, Vol. 22, No. 2, Pp. 155–165, Nov. 2018, Doi: 10.25042/Jpe.112018.08.

Maritime New Zealand., Barge Stability Guidelines. Maritime New Zealand, 2006.

Published

2023-11-08

How to Cite

[1]
A. D. S. Saragih, D. L. Putri, A. Alamsyah, and A. Dianiswara, “Analisis Stabilitas Decommissioning Barge 400 Feet Ketika Lifting Operation”, zonalaut, vol. 4, no. 3, pp. 211-218, Nov. 2023.

Issue

Section

Offshore Building Technology and Engineering

Most read articles by the same author(s)