Sedimentation Study on the Barru Power Plant Intake Canal

Authors

  • Chairul Paotonan Departement of Ocean Engineering Hasanuddin University
  • Arsil Arsil Departement of Ocean Engineering Hasanuddin University

DOI:

https://doi.org/10.62012/zl.v3i3.24310

Keywords:

Sedimentasi, Pemodelan Hidrodinamika, Gelombang laut, Pasang surut air laut, PLTU

Abstract

Increasing the cooling capacity of generator engines or condenser engines by utilizing sea water at PLTU Barru requires dredging the intake channel with a dredging length of ±80 m and a depth of -4m LWS. The problem is that dredging the intake canal has the potential to cause silting back in the area that has been dredged due to coastal hydrodynamic processes which can cause blockage of the intake canal and disrupt the process of the pumping system and the generating system as a whole. A study is needed to assess the potential for sedimentation around the dredging area. This research uses primary data and secondary data. The primary data consists of bathymetry data, currents, tides and bottom sediments and water samples. While the secondary data includes comparative wave and tidal data as well as the design of the dredging plan. Wave data is sourced from the European Center for Medium-Range Weather Forecasts (ECMWF) while comparative tide data is obtained from the Geospatial Information Agency (BIG). The data obtained is then analyzed to obtain the parameters of currents, tides, sediment and breaking waves as well as sediment transport along the coast. Calculation of sediment flows and transport was also carried out by numerical modelling using a surface-water modelling system (SMS). Furthermore, by using the results of analytical sediment transport analysis and numerical modelling, the thickness of the trapped sediment is calculated in the intake canal after dredging. The results of numerical modelling analysis show that the potential for sedimentation at the study site originates from currents due to tides and currents due to breaking waves. The predicted potential for sedimentation due to tidal currents and broken wave currents for 1 year is 43.64 m3 and 1,589.93 m3 respectively with a sediment thickness of 1.2 meters from the bottom of the excavation so that intake channel maintenance is required at least once a year.

Downloads

Download data is not yet available.

References

Ashfania, dkk, 2021, Optimisasi Dimensi Kanal Outfall Air Pendingin PLTU Dengan Memperhatikan

Dampak Lingkungan Lingkungan Pada Air Laut, ROTASI, Vol. 23 No. 3. Hal. 16-25.

Herlambang A.R, dkk, 2016, Studi Transpor Sedimen Di Teluk Benoa Menggunakan Pemodelan

Numerik, Jurnal Kelautan Volume 9, No. 2.

Rio Demak Hasibuan, dkk, 2015, Analisis Pasang Surut Dengan Menggunakan Metode Least Square Dan

Penentuan Periode Ulang Pasang Surut Dengan Metode Gumbel Di Perairan Boom Baru Dan Tanjung

Buyut, MASPARI JOURNAL, 7(1): 35-48.

Kampf, J., 2009, Ocean Modelling for Beginners. Springer Heidelberg Dordrecht London New Yor

Chen, C., Beardsley, Cowles, R. C., & Geoffrey, 2006, An Unstructured Grid, Finite Volume Coastal

Ocean Model (FVCOM) User Manual.

Triadmodjo, B., 1999, Teknik Pantai, Beta Offset, Yogyakarta.

CERC, 1984, Shore Protection Manual Volume I and II, US Army Coastal Engineering Research Center

Department of the Army, Washington DCUS. (SPM, 1984).

Published

2022-11-26

How to Cite

[1]
C. Paotonan and A. Arsil, “Sedimentation Study on the Barru Power Plant Intake Canal”, zonalaut, vol. 3, no. 3, pp. 30-40, Nov. 2022.

Issue

Section

Oceanography and Coastal Engineering

Most read articles by the same author(s)