Financial Performance Analysis on the Makassar – Parepare Public Railway Infrastructure Development Project
CASE STUDY ON THE F SEGMENT OF TONASA
Keywords:
financial performance, financial analysis, earned value method, liability rationAbstract
Judging from the Area and Scope of Work above, it can be explained that there are 4 (four) work areas covering Pattalasang Village, Battara Village, Taraweang Village, Mangilu Village with 6 (six) core work items, namely Civil Works weighing 48.5%, Railroad Works weighing 17.5 %, Box Culvert Jobs are 13.4%, Bridge Works are 9.8%, Money Orders are 1.1%, FASOP Jobs are 7.5%. in the picture above can provide an overview to consider and contain various elements of uncertainty in a project in order to focus on project completion time and scheduling more thoroughly. Based on the above phenomenon, it is necessary to conduct a financial analysis on the Makassar – Parepare Public Railway Infrastructure Development project. This study aims to determine the performance, cost, time, cash flow by analyzing the financial performance of the Makassar - Parepare Public Railway Infrastructure Development project with a case study on the Tonasa Direction F Segment in Pangkep Regency through the Earned Value Method and Liability Ratio. The results of the study indicate that project performance is influenced predominantly by external factors.Downloads
Download data is not yet available.
Published
2023-05-27
Issue
Section
Articles